| Initiative | Owner / Sponsor | Progress | Timeline | Budget | Milestones | Status | Action |
|---|---|---|---|---|---|---|---|
| Improve complaint resolution Initiative 014 INIT-0014 | u_owner_02 Sponsor: u_sponsor_01 | 64.91297441209292% | — | 500,000 | 4 milestones3 deliverables | at_risk | |
| Improve investment attraction Initiative 026 INIT-0026 | u_owner_05 Sponsor: u_sponsor_06 | 83.41272774247619% | — | 250,000 | 4 milestones3 deliverables | at_risk | |
| Improve community event readiness Initiative 032 INIT-0032 | u_owner_05 Sponsor: u_sponsor_01 | 74.38262580462855% | — | 5,000,000 | 4 milestones3 deliverables | at_risk | |
| Improve heritage district upkeep Initiative 039 INIT-0039 | u_owner_13 Sponsor: u_sponsor_06 | 91.49851552962602% | — | 750,000 | 4 milestones3 deliverables | at_risk | |
| Improve waterfront and tourism services Initiative 072 INIT-0072 | u_owner_01 Sponsor: u_sponsor_05 | 67.11445308775173% | — | 2,500,000 | 4 milestones3 deliverables | at_risk | |
| Improve neighborhood cleanliness Initiative 074 INIT-0074 | u_owner_03 Sponsor: u_sponsor_04 | 71.99266550833472% | — | 250,000 | 4 milestones3 deliverables | at_risk | |
| Improve operational transparency Initiative 081 INIT-0081 | u_owner_05 Sponsor: u_sponsor_03 | 73.17110270092307% | — | 250,000 | 4 milestones3 deliverables | at_risk | |
| Strengthen emergency readiness Initiative 095 INIT-0095 | u_owner_05 Sponsor: u_sponsor_07 | 78.18555410908887% | — | 2,500,000 | 4 milestones3 deliverables | at_risk | |
| Improve municipal asset maintenance Initiative 108 INIT-0108 | u_owner_15 Sponsor: u_sponsor_07 | 84.59318960651707% | — | 2,500,000 | 4 milestones3 deliverables | at_risk | |
| Improve governance and compliance Initiative 113 INIT-0113 | u_owner_09 Sponsor: u_sponsor_04 | 82.09535824802569% | — | 2,500,000 | 4 milestones3 deliverables | at_risk | |
| Improve neighborhood cleanliness Initiative 119 INIT-0119 | u_owner_03 Sponsor: u_sponsor_01 | 79.5016709606264% | — | 1,200,000 | 4 milestones3 deliverables | at_risk | |
| Improve SLA adherence Initiative 124 INIT-0124 | u_owner_09 Sponsor: u_sponsor_07 | 81.65289839713985% | — | 5,000,000 | 4 milestones3 deliverables | at_risk | |
| Improve operational transparency Initiative 126 INIT-0126 | u_owner_01 Sponsor: u_sponsor_06 | 79.73785427160959% | — | 750,000 | 4 milestones3 deliverables | at_risk | |
| Improve pest control response Initiative 133 INIT-0133 | u_owner_01 Sponsor: u_sponsor_06 | 84.54981045135182% | — | 1,200,000 | 4 milestones3 deliverables | at_risk | |
| Strengthen emergency readiness Initiative 140 INIT-0140 | u_owner_05 Sponsor: u_sponsor_03 | 74.81771213510412% | — | 500,000 | 4 milestones3 deliverables | at_risk | |
| Improve SLA adherence Initiative 169 INIT-0169 | u_owner_05 Sponsor: u_sponsor_04 | 83.5484808887769% | — | 1,200,000 | 4 milestones3 deliverables | at_risk | |
| Improve municipal project delivery Initiative 170 INIT-0170 | u_owner_09 Sponsor: u_sponsor_05 | 77.53750999314286% | — | 250,000 | 4 milestones3 deliverables | at_risk | |
| Improve accessibility of services Initiative 172 INIT-0172 | u_owner_11 Sponsor: u_sponsor_06 | 64.3503487090568% | — | 750,000 | 4 milestones3 deliverables | at_risk | |
| Strengthen emergency readiness Initiative 185 INIT-0185 | u_owner_04 Sponsor: u_sponsor_04 | 74.2943736245968% | — | 5,000,000 | 4 milestones3 deliverables | at_risk | |
| Improve field workforce productivity Initiative 200 INIT-0200 | u_owner_04 Sponsor: u_sponsor_05 | 83.48355021037406% | — | 500,000 | 4 milestones3 deliverables | at_risk | |
| Enhance quality of life Initiative 002 INIT-0002 | u_owner_14 Sponsor: u_sponsor_02 | 76.22789629958095% | — | 2,500,000 | 4 milestones3 deliverables | completed | |
| Increase digital service adoption Initiative 004 INIT-0004 | u_owner_10 Sponsor: u_sponsor_06 | 74.27808300897247% | — | 5,000,000 | 4 milestones3 deliverables | completed | |
| Increase inspection coverage Initiative 013 INIT-0013 | u_owner_13 Sponsor: u_sponsor_03 | 82.14284968057318% | — | 750,000 | 4 milestones3 deliverables | completed | |
| Improve public market compliance Initiative 031 INIT-0031 | u_owner_07 Sponsor: u_sponsor_01 | 59.379406441519585% | — | 2,500,000 | 4 milestones3 deliverables | completed | |
| Improve SLA adherence Initiative 034 INIT-0034 | u_owner_04 Sponsor: u_sponsor_06 | 83.15303195275307% | — | 5,000,000 | 4 milestones3 deliverables | completed | |
| Improve operational transparency Initiative 036 INIT-0036 | u_owner_12 Sponsor: u_sponsor_02 | 75.41473152298833% | — | 750,000 | 4 milestones3 deliverables | completed | |
| Improve pest control response Initiative 043 INIT-0043 | u_owner_14 Sponsor: u_sponsor_01 | 73.39511623629932% | — | 750,000 | 4 milestones3 deliverables | completed | |
| Improve citizen satisfaction Initiative 053 INIT-0053 | u_owner_04 Sponsor: u_sponsor_04 | 95.6217302614293% | — | 250,000 | 4 milestones3 deliverables | completed | |
| Improve parks and public spaces Initiative 055 INIT-0055 | u_owner_06 Sponsor: u_sponsor_06 | 81.79034115270645% | — | 5,000,000 | 4 milestones3 deliverables | completed | |
| Improve waste collection efficiency Initiative 057 INIT-0057 | u_owner_11 Sponsor: u_sponsor_05 | 79.8611374841204% | — | 250,000 | 4 milestones3 deliverables | completed | |
| Increase inspection coverage Initiative 058 INIT-0058 | u_owner_04 Sponsor: u_sponsor_06 | 74.60382275618433% | — | 500,000 | 4 milestones3 deliverables | completed | |
| Improve stormwater readiness Initiative 061 INIT-0061 | u_owner_11 Sponsor: u_sponsor_03 | 85.70496557577592% | — | 250,000 | 4 milestones3 deliverables | completed | |
| Improve customer experience Initiative 064 INIT-0064 | u_owner_11 Sponsor: u_sponsor_03 | 79.96385689424909% | — | 1,200,000 | 4 milestones3 deliverables | completed | |
| Improve fiscal efficiency Initiative 066 INIT-0066 | u_owner_03 Sponsor: u_sponsor_06 | 79.01830250171429% | — | 250,000 | 4 milestones3 deliverables | completed | |
| Improve traffic and access around public facilities Initiative 073 INIT-0073 | u_owner_15 Sponsor: u_sponsor_07 | 88.07043747213416% | — | 5,000,000 | 4 milestones3 deliverables | completed | |
| Improve licence renewal experience Initiative 075 INIT-0075 | u_owner_11 Sponsor: u_sponsor_05 | 84.84735357325164% | — | 750,000 | 4 milestones3 deliverables | completed | |
| Improve municipal project delivery Initiative 080 INIT-0080 | u_owner_04 Sponsor: u_sponsor_04 | 81.5498035878894% | — | 500,000 | 4 milestones3 deliverables | completed | |
| Improve pest control response Initiative 088 INIT-0088 | u_owner_03 Sponsor: u_sponsor_05 | 63.499779612685714% | — | 2,500,000 | 4 milestones3 deliverables | completed | |
| Improve seasonal readiness Initiative 089 INIT-0089 | u_owner_13 Sponsor: u_sponsor_07 | 77.77061178550943% | — | 250,000 | 4 milestones3 deliverables | completed | |
| Improve environmental cleanliness Initiative 096 INIT-0096 | u_owner_15 Sponsor: u_sponsor_02 | 72.55957052781396% | — | 250,000 | 4 milestones3 deliverables | completed | |
| Increase inspection coverage Initiative 103 INIT-0103 | u_owner_08 Sponsor: u_sponsor_06 | 87.32459148409838% | — | 750,000 | 4 milestones3 deliverables | completed | |
| Improve public health monitoring Initiative 105 INIT-0105 | u_owner_04 Sponsor: u_sponsor_01 | 64.53776658193628% | — | 250,000 | 4 milestones3 deliverables | completed | |
| Increase service channel integration Initiative 112 INIT-0112 | u_owner_14 Sponsor: u_sponsor_04 | 79.80164985712629% | — | 750,000 | 4 milestones3 deliverables | completed | |
| Improve investment attraction Initiative 116 INIT-0116 | u_owner_11 Sponsor: u_sponsor_04 | 67.54114008613824% | — | 500,000 | 4 milestones3 deliverables | completed | |
| Improve licence renewal experience Initiative 120 INIT-0120 | u_owner_12 Sponsor: u_sponsor_06 | 76.62775292% | — | 750,000 | 4 milestones3 deliverables | completed | |
| Improve municipal project delivery Initiative 125 INIT-0125 | u_owner_13 Sponsor: u_sponsor_04 | 78.84869333975452% | — | 500,000 | 4 milestones3 deliverables | completed | |
| Improve accessibility of services Initiative 127 INIT-0127 | u_owner_07 Sponsor: u_sponsor_01 | 77.9570172032% | — | 2,500,000 | 4 milestones3 deliverables | completed | |
| Improve heritage district upkeep Initiative 129 INIT-0129 | u_owner_03 Sponsor: u_sponsor_07 | 80.06930470031925% | — | 500,000 | 4 milestones3 deliverables | completed | |
| Improve public lighting maintenance Initiative 131 INIT-0131 | u_owner_06 Sponsor: u_sponsor_05 | 90.37795623418994% | — | 1,200,000 | 4 milestones3 deliverables | completed | |
| Improve water network coordination Initiative 132 INIT-0132 | u_owner_15 Sponsor: u_sponsor_03 | 78.09941774539853% | — | 250,000 | 4 milestones3 deliverables | completed | |
| Enhance quality of life Initiative 137 INIT-0137 | u_owner_08 Sponsor: u_sponsor_01 | 86.7457481997298% | — | 5,000,000 | 4 milestones3 deliverables | completed | |
| Improve urban landscape Initiative 138 INIT-0138 | u_owner_05 Sponsor: u_sponsor_06 | 88.18671895897391% | — | 5,000,000 | 4 milestones3 deliverables | completed | |
| Improve parks and public spaces Initiative 145 INIT-0145 | u_owner_05 Sponsor: u_sponsor_07 | 87.9402019324193% | — | 500,000 | 4 milestones3 deliverables | completed | |
| Improve complaint resolution Initiative 149 INIT-0149 | u_owner_13 Sponsor: u_sponsor_03 | 88.86534030460642% | — | 750,000 | 4 milestones3 deliverables | completed | |
| Improve stormwater readiness Initiative 151 INIT-0151 | u_owner_08 Sponsor: u_sponsor_04 | 85.98689176786183% | — | 250,000 | 4 milestones3 deliverables | completed | |
| Improve contractor performance Initiative 152 INIT-0152 | u_owner_10 Sponsor: u_sponsor_01 | 82.10710431973334% | — | 2,500,000 | 4 milestones3 deliverables | completed | |
| Improve municipal call center performance Initiative 168 INIT-0168 | u_owner_09 Sponsor: u_sponsor_04 | 75.88767080285714% | — | 1,200,000 | 4 milestones3 deliverables | completed | |
| Improve operational transparency Initiative 171 INIT-0171 | u_owner_09 Sponsor: u_sponsor_05 | 82.32208260468552% | — | 5,000,000 | 4 milestones3 deliverables | completed | |
| Improve seasonal readiness Initiative 179 INIT-0179 | u_owner_15 Sponsor: u_sponsor_03 | 84.48232391328808% | — | 1,200,000 | 4 milestones3 deliverables | completed | |
| Improve municipal service quality Initiative 181 INIT-0181 | u_owner_03 Sponsor: u_sponsor_07 | 82.12191265069387% | — | 500,000 | 4 milestones3 deliverables | completed | |
| Field Dispatch Optimisation Programme INIT-0136 | u_owner_04 Sponsor: u_sponsor_01 | 43% | — | 2,500,000 | 5 milestones4 deliverables | decision_required | |
| Accelerate permit processing Initiative 007 INIT-0007 | u_owner_02 Sponsor: u_sponsor_07 | 60.125464477320946% | — | 500,000 | 4 milestones3 deliverables | delayed | |
| Improve contractor performance Initiative 017 INIT-0017 | u_owner_01 Sponsor: u_sponsor_05 | 85.65975303374063% | — | 500,000 | 4 milestones3 deliverables | delayed | |
| Improve data-driven decision making Initiative 024 INIT-0024 | u_owner_07 Sponsor: u_sponsor_07 | 77.48398046455156% | — | 2,500,000 | 4 milestones3 deliverables | delayed | |
| Improve traffic and access around public facilities Initiative 028 INIT-0028 | u_owner_11 Sponsor: u_sponsor_07 | 73.45948289444026% | — | 250,000 | 4 milestones3 deliverables | delayed | |
| Improve public lighting maintenance Initiative 041 INIT-0041 | u_owner_15 Sponsor: u_sponsor_02 | 88.35142348800674% | — | 750,000 | 4 milestones3 deliverables | delayed | |
| Improve water network coordination Initiative 042 INIT-0042 | u_owner_10 Sponsor: u_sponsor_07 | 72.48573938312292% | — | 250,000 | 4 milestones3 deliverables | delayed | |
| Increase digital service adoption Initiative 049 INIT-0049 | u_owner_15 Sponsor: u_sponsor_01 | 80.27734608685714% | — | 250,000 | 4 milestones3 deliverables | delayed | |
| Reduce visual distortion Initiative 056 INIT-0056 | u_owner_06 Sponsor: u_sponsor_04 | 73.90548690616801% | — | 1,200,000 | 4 milestones3 deliverables | delayed | |
| Improve municipal asset maintenance Initiative 063 INIT-0063 | u_owner_04 Sponsor: u_sponsor_04 | 72.22222679118752% | — | 750,000 | 4 milestones3 deliverables | delayed | |
| Improve governance and compliance Initiative 068 INIT-0068 | u_owner_07 Sponsor: u_sponsor_06 | 77.29840037669686% | — | 250,000 | 4 milestones3 deliverables | delayed | |
| Improve investment attraction Initiative 071 INIT-0071 | u_owner_15 Sponsor: u_sponsor_03 | 83.68554292163263% | — | 5,000,000 | 4 milestones3 deliverables | delayed | |
| Improve community event readiness Initiative 077 INIT-0077 | u_owner_03 Sponsor: u_sponsor_02 | 76.47126176597936% | — | 2,500,000 | 4 milestones3 deliverables | delayed | |
| Improve municipal call center performance Initiative 078 INIT-0078 | u_owner_04 Sponsor: u_sponsor_06 | 90.69255900884545% | — | 250,000 | 4 milestones3 deliverables | delayed | |
| Improve SLA adherence Initiative 079 INIT-0079 | u_owner_08 Sponsor: u_sponsor_05 | 61.06098041727619% | — | 5,000,000 | 4 milestones3 deliverables | delayed | |
| Improve safety inspections Initiative 083 INIT-0083 | u_owner_11 Sponsor: u_sponsor_03 | 81.46415022129655% | — | 2,500,000 | 4 milestones3 deliverables | delayed | |
| Improve urban landscape Initiative 093 INIT-0093 | u_owner_12 Sponsor: u_sponsor_03 | 63.11796285331092% | — | 250,000 | 4 milestones3 deliverables | delayed | |
| Improve waste collection efficiency Initiative 102 INIT-0102 | u_owner_13 Sponsor: u_sponsor_04 | 90.08402428754286% | — | 5,000,000 | 4 milestones3 deliverables | delayed | |
| Improve smart city readiness Initiative 130 INIT-0130 | u_owner_10 Sponsor: u_sponsor_07 | 72.28229760041643% | — | 2,500,000 | 4 milestones3 deliverables | delayed | |
| Improve seasonal readiness Initiative 134 INIT-0134 | u_owner_11 Sponsor: u_sponsor_04 | 79.6950679900471% | — | 500,000 | 4 milestones3 deliverables | delayed | |
| Increase digital service adoption Initiative 139 INIT-0139 | u_owner_11 Sponsor: u_sponsor_05 | 76.87579797737635% | — | 2,500,000 | 4 milestones3 deliverables | delayed | |
| Accelerate permit processing Initiative 142 INIT-0142 | u_owner_05 Sponsor: u_sponsor_03 | 79.66378507387546% | — | 500,000 | 4 milestones3 deliverables | delayed | |
| Improve governance and compliance Initiative 158 INIT-0158 | u_owner_02 Sponsor: u_sponsor_04 | 83.92416198850698% | — | 500,000 | 4 milestones3 deliverables | delayed | |
| Improve public market compliance Initiative 166 INIT-0166 | u_owner_10 Sponsor: u_sponsor_02 | 78.3349370693348% | — | 1,200,000 | 4 milestones3 deliverables | delayed | |
| Improve water network coordination Initiative 177 INIT-0177 | u_owner_13 Sponsor: u_sponsor_07 | 62.321794149886344% | — | 250,000 | 4 milestones3 deliverables | delayed | |
| Enhance quality of life Initiative 182 INIT-0182 | u_owner_03 Sponsor: u_sponsor_01 | 80.63739809792445% | — | 250,000 | 4 milestones3 deliverables | delayed | |
| Increase digital service adoption Initiative 184 INIT-0184 | u_owner_03 Sponsor: u_sponsor_05 | 69.66652285220319% | — | 500,000 | 4 milestones3 deliverables | delayed | |
| Accelerate permit processing Initiative 187 INIT-0187 | u_owner_13 Sponsor: u_sponsor_04 | 80.02665336427826% | — | 2,500,000 | 4 milestones3 deliverables | delayed | |
| Improve road and street maintenance Initiative 189 INIT-0189 | u_owner_05 Sponsor: u_sponsor_03 | 80.83402769546117% | — | 2,500,000 | 4 milestones3 deliverables | delayed | |
| Reduce visual distortion Initiative 191 INIT-0191 | u_owner_12 Sponsor: u_sponsor_03 | 72.03629441119048% | — | 1,200,000 | 4 milestones3 deliverables | delayed | |
| Increase inspection coverage Initiative 193 INIT-0193 | u_owner_10 Sponsor: u_sponsor_02 | 83.05017079524252% | — | 250,000 | 4 milestones3 deliverables | delayed | |
| Improve public health monitoring Initiative 195 INIT-0195 | u_owner_09 Sponsor: u_sponsor_03 | 88.81637339355514% | — | 5,000,000 | 4 milestones3 deliverables | delayed | |
| Improve municipal asset maintenance Initiative 198 INIT-0198 | u_owner_05 Sponsor: u_sponsor_07 | 64.47202342171128% | — | 500,000 | 4 milestones3 deliverables | delayed | |
| Improve municipal service quality Initiative 001 INIT-0001 | u_owner_04 Sponsor: u_sponsor_05 | 75.61487484931148% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Improve urban landscape Initiative 003 INIT-0003 | u_owner_02 Sponsor: u_sponsor_04 | 87.85243368880707% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve citizen satisfaction Initiative 008 INIT-0008 | u_owner_15 Sponsor: u_sponsor_03 | 72.30415529411383% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve road and street maintenance Initiative 009 INIT-0009 | u_owner_03 Sponsor: u_sponsor_01 | 66.36692996558477% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve parks and public spaces Initiative 010 INIT-0010 | u_owner_05 Sponsor: u_sponsor_03 | 80.04526160292556% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve waste collection efficiency Initiative 012 INIT-0012 | u_owner_03 Sponsor: u_sponsor_04 | 73.91661181180952% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve public health monitoring Initiative 015 INIT-0015 | u_owner_12 Sponsor: u_sponsor_05 | 59.63392737659448% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve stormwater readiness Initiative 016 INIT-0016 | u_owner_11 Sponsor: u_sponsor_04 | 81.40588391537787% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve municipal asset maintenance Initiative 018 INIT-0018 | u_owner_01 Sponsor: u_sponsor_04 | 74.1310854167619% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve field workforce productivity Initiative 020 INIT-0020 | u_owner_09 Sponsor: u_sponsor_07 | 81.42156602998617% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Increase service channel integration Initiative 022 INIT-0022 | u_owner_14 Sponsor: u_sponsor_03 | 79.2430137537037% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve waterfront and tourism services Initiative 027 INIT-0027 | u_owner_12 Sponsor: u_sponsor_02 | 76.43286951110153% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve neighborhood cleanliness Initiative 029 INIT-0029 | u_owner_08 Sponsor: u_sponsor_05 | 79.43435944158794% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Improve licence renewal experience Initiative 030 INIT-0030 | u_owner_05 Sponsor: u_sponsor_05 | 68.6936757849241% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve municipal call center performance Initiative 033 INIT-0033 | u_owner_12 Sponsor: u_sponsor_01 | 71.58226188735905% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve municipal project delivery Initiative 035 INIT-0035 | u_owner_05 Sponsor: u_sponsor_01 | 79.06573082906505% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve accessibility of services Initiative 037 INIT-0037 | u_owner_01 Sponsor: u_sponsor_07 | 58.461389801263984% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve safety inspections Initiative 038 INIT-0038 | u_owner_11 Sponsor: u_sponsor_03 | 74.74943662533333% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve smart city readiness Initiative 040 INIT-0040 | u_owner_09 Sponsor: u_sponsor_06 | 70.2245571254824% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve seasonal readiness Initiative 044 INIT-0044 | u_owner_04 Sponsor: u_sponsor_02 | 81.25795696564913% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve municipal service quality Initiative 046 INIT-0046 | u_owner_15 Sponsor: u_sponsor_03 | 72.3394372579588% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Enhance quality of life Initiative 047 INIT-0047 | u_owner_11 Sponsor: u_sponsor_01 | 79.72655772837166% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve urban landscape Initiative 048 INIT-0048 | u_owner_10 Sponsor: u_sponsor_07 | 67.73294668892055% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Strengthen emergency readiness Initiative 050 INIT-0050 | u_owner_05 Sponsor: u_sponsor_02 | 80.05676853192381% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve environmental cleanliness Initiative 051 INIT-0051 | u_owner_15 Sponsor: u_sponsor_07 | 89.63435861664762% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Accelerate permit processing Initiative 052 INIT-0052 | u_owner_04 Sponsor: u_sponsor_01 | 78.45057787394595% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve road and street maintenance Initiative 054 INIT-0054 | u_owner_09 Sponsor: u_sponsor_07 | 89.08894687723308% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve public health monitoring Initiative 060 INIT-0060 | u_owner_03 Sponsor: u_sponsor_04 | 84.21789273830254% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve contractor performance Initiative 062 INIT-0062 | u_owner_15 Sponsor: u_sponsor_02 | 76.1055065083501% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve field workforce productivity Initiative 065 INIT-0065 | u_owner_12 Sponsor: u_sponsor_02 | 66.80944116011096% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Increase service channel integration Initiative 067 INIT-0067 | u_owner_05 Sponsor: u_sponsor_05 | 94.35022593824665% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Improve data-driven decision making Initiative 069 INIT-0069 | u_owner_01 Sponsor: u_sponsor_07 | 79.68575175766725% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve public market compliance Initiative 076 INIT-0076 | u_owner_01 Sponsor: u_sponsor_04 | 71.41347367491124% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve public lighting maintenance Initiative 086 INIT-0086 | u_owner_08 Sponsor: u_sponsor_05 | 57.3382299628791% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve water network coordination Initiative 087 INIT-0087 | u_owner_10 Sponsor: u_sponsor_03 | 66.55615221954062% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve public realm resilience Initiative 090 INIT-0090 | u_owner_09 Sponsor: u_sponsor_06 | 95.92374811208964% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Enhance quality of life Initiative 092 INIT-0092 | u_owner_08 Sponsor: u_sponsor_04 | 70.21717267432712% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve citizen satisfaction Initiative 098 INIT-0098 | u_owner_13 Sponsor: u_sponsor_06 | 87.32418212411919% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve parks and public spaces Initiative 100 INIT-0100 | u_owner_07 Sponsor: u_sponsor_02 | 79.40231388684408% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Reduce visual distortion Initiative 101 INIT-0101 | u_owner_02 Sponsor: u_sponsor_04 | 76.39146579221388% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve stormwater readiness Initiative 106 INIT-0106 | u_owner_14 Sponsor: u_sponsor_06 | 74.28272837714286% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve contractor performance Initiative 107 INIT-0107 | u_owner_08 Sponsor: u_sponsor_05 | 75.11970954481633% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Improve customer experience Initiative 109 INIT-0109 | u_owner_12 Sponsor: u_sponsor_05 | 89.13375582152803% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve data-driven decision making Initiative 114 INIT-0114 | u_owner_07 Sponsor: u_sponsor_05 | 77.33259971386667% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Improve district-level performance Initiative 115 INIT-0115 | u_owner_06 Sponsor: u_sponsor_04 | 92.65566863447094% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve waterfront and tourism services Initiative 117 INIT-0117 | u_owner_11 Sponsor: u_sponsor_03 | 88.10840682384762% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Improve traffic and access around public facilities Initiative 118 INIT-0118 | u_owner_02 Sponsor: u_sponsor_04 | 81.33510417616327% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve public market compliance Initiative 121 INIT-0121 | u_owner_12 Sponsor: u_sponsor_04 | 86.98353380824081% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve community event readiness Initiative 122 INIT-0122 | u_owner_02 Sponsor: u_sponsor_06 | 69.8534821124514% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve municipal call center performance Initiative 123 INIT-0123 | u_owner_02 Sponsor: u_sponsor_07 | 84.60968374063611% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve safety inspections Initiative 128 INIT-0128 | u_owner_04 Sponsor: u_sponsor_03 | 69.2197639265641% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve environmental cleanliness Initiative 141 INIT-0141 | u_owner_13 Sponsor: u_sponsor_05 | 66.13807335942393% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve road and street maintenance Initiative 144 INIT-0144 | u_owner_08 Sponsor: u_sponsor_01 | 86.53532776205714% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Improve waste collection efficiency Initiative 147 INIT-0147 | u_owner_09 Sponsor: u_sponsor_04 | 80.15680763547618% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Increase inspection coverage Initiative 148 INIT-0148 | u_owner_03 Sponsor: u_sponsor_04 | 65.79360895068932% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve public health monitoring Initiative 150 INIT-0150 | u_owner_01 Sponsor: u_sponsor_07 | 90.3959311917903% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve municipal asset maintenance Initiative 153 INIT-0153 | u_owner_02 Sponsor: u_sponsor_04 | 65.35429715511145% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve customer experience Initiative 154 INIT-0154 | u_owner_07 Sponsor: u_sponsor_06 | 91.3830046242721% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve fiscal efficiency Initiative 156 INIT-0156 | u_owner_13 Sponsor: u_sponsor_01 | 76.15908279951901% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Increase service channel integration Initiative 157 INIT-0157 | u_owner_01 Sponsor: u_sponsor_03 | 84.20556273032258% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve investment attraction Initiative 161 INIT-0161 | u_owner_04 Sponsor: u_sponsor_07 | 73.64704473376135% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Improve waterfront and tourism services Initiative 162 INIT-0162 | u_owner_08 Sponsor: u_sponsor_05 | 70.8807459796453% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve traffic and access around public facilities Initiative 163 INIT-0163 | u_owner_02 Sponsor: u_sponsor_07 | 64.14985927206202% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve neighborhood cleanliness Initiative 164 INIT-0164 | u_owner_08 Sponsor: u_sponsor_07 | 61.440710876679375% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve licence renewal experience Initiative 165 INIT-0165 | u_owner_09 Sponsor: u_sponsor_03 | 82.79548037702703% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve community event readiness Initiative 167 INIT-0167 | u_owner_03 Sponsor: u_sponsor_02 | 89.24912682013512% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve safety inspections Initiative 173 INIT-0173 | u_owner_14 Sponsor: u_sponsor_01 | 67.87916049518208% | — | 500,000 | 4 milestones3 deliverables | in_progress | |
| Improve heritage district upkeep Initiative 174 INIT-0174 | u_owner_06 Sponsor: u_sponsor_02 | 78.71719182285715% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve smart city readiness Initiative 175 INIT-0175 | u_owner_10 Sponsor: u_sponsor_05 | 84.38785753318251% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve public lighting maintenance Initiative 176 INIT-0176 | u_owner_06 Sponsor: u_sponsor_07 | 81.21990752214286% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve pest control response Initiative 178 INIT-0178 | u_owner_06 Sponsor: u_sponsor_03 | 72.99249830380302% | — | 5,000,000 | 4 milestones3 deliverables | in_progress | |
| Improve urban landscape Initiative 183 INIT-0183 | u_owner_14 Sponsor: u_sponsor_07 | 74.02356273389012% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve environmental cleanliness Initiative 186 INIT-0186 | u_owner_11 Sponsor: u_sponsor_01 | 71.74544521897091% | — | 2,500,000 | 4 milestones3 deliverables | in_progress | |
| Improve parks and public spaces Initiative 190 INIT-0190 | u_owner_10 Sponsor: u_sponsor_03 | 70.79267312339171% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve waste collection efficiency Initiative 192 INIT-0192 | u_owner_13 Sponsor: u_sponsor_03 | 67.09457149897675% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve complaint resolution Initiative 194 INIT-0194 | u_owner_11 Sponsor: u_sponsor_01 | 75.76187102213736% | — | 250,000 | 4 milestones3 deliverables | in_progress | |
| Improve stormwater readiness Initiative 196 INIT-0196 | u_owner_11 Sponsor: u_sponsor_03 | 66.8746487608024% | — | 1,200,000 | 4 milestones3 deliverables | in_progress | |
| Improve contractor performance Initiative 197 INIT-0197 | u_owner_02 Sponsor: u_sponsor_05 | 76.3962353625567% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Improve customer experience Initiative 199 INIT-0199 | u_owner_15 Sponsor: u_sponsor_05 | 65.93259631986885% | — | 750,000 | 4 milestones3 deliverables | in_progress | |
| Strengthen emergency readiness Initiative 005 INIT-0005 | u_owner_08 Sponsor: u_sponsor_07 | 75.10065837561905% | — | 750,000 | 4 milestones3 deliverables | not_started | |
| Improve environmental cleanliness Initiative 006 INIT-0006 | u_owner_14 Sponsor: u_sponsor_01 | 76.87543933522153% | — | 500,000 | 4 milestones3 deliverables | not_started | |
| Reduce visual distortion Initiative 011 INIT-0011 | u_owner_13 Sponsor: u_sponsor_01 | 81.1880266056% | — | 2,500,000 | 4 milestones3 deliverables | not_started | |
| Improve customer experience Initiative 019 INIT-0019 | u_owner_10 Sponsor: u_sponsor_02 | 62.86420833044729% | — | 2,500,000 | 4 milestones3 deliverables | not_started | |
| Improve fiscal efficiency Initiative 021 INIT-0021 | u_owner_10 Sponsor: u_sponsor_06 | 78.68566092677153% | — | 250,000 | 4 milestones3 deliverables | not_started | |
| Improve governance and compliance Initiative 023 INIT-0023 | u_owner_04 Sponsor: u_sponsor_02 | 77.78299356318901% | — | 500,000 | 4 milestones3 deliverables | not_started | |
| Improve district-level performance Initiative 025 INIT-0025 | u_owner_07 Sponsor: u_sponsor_02 | 62.13978916190476% | — | 250,000 | 4 milestones3 deliverables | not_started | |
| Improve public realm resilience Initiative 045 INIT-0045 | u_owner_08 Sponsor: u_sponsor_01 | 75.75934869308924% | — | 2,500,000 | 4 milestones3 deliverables | not_started | |
| Improve complaint resolution Initiative 059 INIT-0059 | u_owner_05 Sponsor: u_sponsor_04 | 82.62342874628348% | — | 750,000 | 4 milestones3 deliverables | not_started | |
| Improve district-level performance Initiative 070 INIT-0070 | u_owner_07 Sponsor: u_sponsor_01 | 69.0921535448628% | — | 5,000,000 | 4 milestones3 deliverables | not_started | |
| Improve accessibility of services Initiative 082 INIT-0082 | u_owner_15 Sponsor: u_sponsor_04 | 73.85375379698655% | — | 250,000 | 4 milestones3 deliverables | not_started | |
| Improve heritage district upkeep Initiative 084 INIT-0084 | u_owner_14 Sponsor: u_sponsor_05 | 73.56317904906707% | — | 500,000 | 4 milestones3 deliverables | not_started | |
| Improve smart city readiness Initiative 085 INIT-0085 | u_owner_15 Sponsor: u_sponsor_06 | 71.49776415729923% | — | 500,000 | 4 milestones3 deliverables | not_started | |
| Improve municipal service quality Initiative 091 INIT-0091 | u_owner_09 Sponsor: u_sponsor_01 | 77.31111518419047% | — | 500,000 | 4 milestones3 deliverables | not_started | |
| Increase digital service adoption Initiative 094 INIT-0094 | u_owner_08 Sponsor: u_sponsor_05 | 79.25756989866667% | — | 750,000 | 4 milestones3 deliverables | not_started | |
| Accelerate permit processing Initiative 097 INIT-0097 | u_owner_09 Sponsor: u_sponsor_03 | 86.4824998234361% | — | 250,000 | 4 milestones3 deliverables | not_started | |
| Improve road and street maintenance Initiative 099 INIT-0099 | u_owner_10 Sponsor: u_sponsor_01 | 90.820900344% | — | 2,500,000 | 4 milestones3 deliverables | not_started | |
| Improve complaint resolution Initiative 104 INIT-0104 | u_owner_12 Sponsor: u_sponsor_03 | 82.52604846798432% | — | 5,000,000 | 4 milestones3 deliverables | not_started | |
| Improve field workforce productivity Initiative 110 INIT-0110 | u_owner_02 Sponsor: u_sponsor_06 | 78.56413772952381% | — | 750,000 | 4 milestones3 deliverables | not_started | |
| Improve fiscal efficiency Initiative 111 INIT-0111 | u_owner_01 Sponsor: u_sponsor_04 | 87.39843273863474% | — | 1,200,000 | 4 milestones3 deliverables | not_started | |
| Improve public realm resilience Initiative 135 INIT-0135 | u_owner_13 Sponsor: u_sponsor_05 | 81.30729463364102% | — | 250,000 | 4 milestones3 deliverables | not_started | |
| Improve citizen satisfaction Initiative 143 INIT-0143 | u_owner_12 Sponsor: u_sponsor_03 | 59.18220348917978% | — | 2,500,000 | 4 milestones3 deliverables | not_started | |
| Reduce visual distortion Initiative 146 INIT-0146 | u_owner_09 Sponsor: u_sponsor_06 | 76.33921984826374% | — | 500,000 | 4 milestones3 deliverables | not_started | |
| Improve field workforce productivity Initiative 155 INIT-0155 | u_owner_11 Sponsor: u_sponsor_05 | 75.96743673727232% | — | 5,000,000 | 4 milestones3 deliverables | not_started | |
| Improve data-driven decision making Initiative 159 INIT-0159 | u_owner_06 Sponsor: u_sponsor_02 | 81.54681177401304% | — | 250,000 | 4 milestones3 deliverables | not_started | |
| Improve district-level performance Initiative 160 INIT-0160 | u_owner_01 Sponsor: u_sponsor_06 | 81.17411869335677% | — | 5,000,000 | 4 milestones3 deliverables | not_started | |
| Improve public realm resilience Initiative 180 INIT-0180 | u_owner_13 Sponsor: u_sponsor_02 | 75.53145550785715% | — | 1,200,000 | 4 milestones3 deliverables | not_started | |
| Improve citizen satisfaction Initiative 188 INIT-0188 | u_owner_15 Sponsor: u_sponsor_06 | 61.41330272463768% | — | 250,000 | 4 milestones3 deliverables | not_started |